TECS
Engineering,
TECS Engineering, as being one of the Karcıoğlu group companies, manufactures dry coolers, LT/HT radiators for gas and diesel engine powered Generator Sets(GENSETS), Cogeneration systems, Power Plants and Gas Turbine Air Inlet Heating and Cooling Modules. According to our project based approach we consider each demand is being a new product to be manufactured. In this direction, each time we take our customer’s expectations, system requirements and environmental conditions and obligations into consideration and design the optimum solution enables to the clients get benefits technically and commercially.
TECS Engineering production criteria are shaped in accordance with international certificates such as ISO, CE. In addition to these, the heat exchange surface used in our products proved performance by EUROVENT Certification which carries out the tests in compliance with European and International Standards.
TERMOKAR Heat Exchangers is not only a manufacturer also provides the solutions for supplementary products such as oil coolers, fuel coolers and plate heat exchangers in case it is seen required in terms of project or by client.
The factory is located Western of Turkey in Manisa and has 17.000 m2 production area. As a result of the huge increase in business volume in recent years, our new factory with additional 15000 m2 will be ready for our customer needs.
Other Group
Compaines of Karcioglu
Manufactures finned type heat exchangers in 17.500 m² total factory area located in Manisa Organized Industrial Zone (MOSB) and thus has had the opportunity to provide better service to its customers at home and abroad.
The company was established in Çiğli Industrial Zone in 1990. It is involved in in Plastic Injection Mold sector and it is an influential and trendsetter company in its field with its productions in the sectors of white goods, automotive and electronics. As a result of its new investments, it moved to Manisa Industrial Zone in 2012 and continues its activities in the new facilities.
The company was established in 1950 and is one of the most long-established construction companies in İzmir. It has carried out the most prestigious projects in this field and has a company structure that renews and improves itself every year.