TECS Engineering, as being one of the Karcıoğlu group companies, manufactures dry coolers, LT/HT radiators for gas and diesel engine powered Generator Sets(GENSETS), Cogeneration systems, Power Plants and Gas Turbine Air Inlet Heating and Cooling Modules.
According to our project based approach we consider each demand is being a new product to be manufactured. In this direction, each time we take our customer’s expectations, system requirements and environmental conditions and obligations into consideration and design the optimum solution enables to the clients get benefits technically and commercially.
The cogeneration systems are one of the application fields that dry coolers are widely used...
The power plants that are built to generate the electricity for a residential area or an industrial...
Power generator sets are widely used to enable establishments have uninterrupted power...
There are many variation of gas turbines in accordance with application site and power output...
TECS Engineering, as being one of the Karcıoğlu group companies, manufactures dry coolers, LT/HT radiators for gas and diesel engine powered Generator Sets(GENSETS), Cogeneration systems, Power Plants and Gas Turbine Air Inlet Heating and Cooling Modules.
According to our project based approach we consider each demand is being a new product to be manufactured.
All Rights Reserved © tecshx.com | Mavipiksel Web design