

The cogeneration
systems are one of
the application
fields that dry coolers are widely used. When the heat generated by cogeneration system is exceeding the needed level for process or space heating, this load should be dissipated from the system for uninterrupted power and heat generation.
The cogeneration systems are one of the application fields that dry coolers are widely used. When the heat generated by cogeneration system is exceeding the needed level for process or space heating, this load should be dissipated from the system for uninterrupted power and heat generation.

Power generator
sets are widely used
to enable
establishments have uninterrupted power. Diesel or gas engine powered such generator sets are installed all over the world in different places has challenging environmental conditions. Therefore the radiators or dry coolers will be used in this system should be customized as far as possible to avoid any possible power shortage.
The cooling of the generator sets may also be provided by the radiator which it’s fan is driven by crankshaft of engine mechanically but this application could be impossible in terms of restrictions and It could be required to locate the dry cooler or radiator remote from the engine. In such cases, we can offer you optimum cooling solutions.

The power plants
that are built
to generate
the electricity for a residential area or an industrial place may show differences in a wide range of power output. Especially in case the places where need the electricity are away from each other, it may be more attractive to build more power plants in different areas have lower power output. In such power plants the engine generates tens of MW electricity power should run integrated to each other without any trouble.
In addition to this, when we look where the such plants are needed, these places has challenging conditions and this makes the dry coolers or LT/HT radiator to be designed properly as much as possible. In such cases we can offer you customized cooling solutions. Additionally, if it is seen required in terms of application we also carry out the simulation for whole system in terms of structural and heat exchange.

There are many variation
of gas turbines in
accordance with application site and power output. They vary from few KW gas turbines generates for Cogeneration system to the tens of MW integrated again in Power and Cogeneration Plants. The efficiency of gas turbines has highly relation with application site. Its efficiency differs by the reasons that affect the air density. As a result of this, ambient air temperature is one of the main reasons.
According to ISO instructions (@150C ambient temperature), depending on the gas turbine type, power output efficiency is reduced by a percentage up to 10 percent of the ISO-rated power output (@150C air temperature) for every 100C increase in ambient air temperature. In a consequence of this case, the inlet air temperature of gas turbine should be conditioned properly.
Our air pre-heater or cooler modules/coils are designed in accordance with application site conditions, restrictions and customer expectations.

Chillers used in
any application to
dissipate the heat
from process consume the important amount electricity. The increase in unit price of energy consumption and global climate changes make the efficient energy usage more important than before. That’s why to select the cooling system which enables reduction on electricity usage for chiller provides the saving on bills. Dry Coolers one of the solution to be used in such an efficient solution.
Nevertheless it is highly required to analyze ambient conditions and seasonal weather changes otherwise it may cause losses and much longer payback period time than expected.
